Project Description

Texas Motor Speedway was completed in 1997 from construction drawings that were redesigned 125 separate times with a record-breaking schedule of 18 months from start to finish.  TMS features 194 Luxury Suites.

The 2 levels of Luxury Suites spanned over a mile long from start to finish.

General Contractor

The Beck Group

Visit Website

Architect

Yates Chreitzberg Architects

Visit Website